Installation and Commissioning: Ideal requirements for a productive process

In most cases, a KOCH machine or line is a unique model, individualized according to your specifications. As a result, the lead time between order placement and on-site machine acceptance varies. However, the service steps are always the same.

  • Machine acceptance at KOCH (Factory Acceptance Test abbr. FAT)
  • Professional dismantling and transportation 
  • Installation at the customer’s premises by qualified personnel
  • Renewed machine acceptance with detailed protocol (Site Acceptance Test abbr. SAT)
  • Start-up assistance through personnel training and production Support